Stockport Station and the Mid Cheshire Line will be affected by Engineering Work until 4.30pm on Sunday 26th August 2012.
Trains between Southport and Stockport/Chester will run between Southport and Manchester Piccadilly and between Altrincham and Chester with replacement buses running between Manchester Piccadilly and Stockport and between Stockport and Altrincham.
Passengers should note that rail tickets to and from stations between Mouldsworth and Altrincham/Navigation Road are valid for travel on the Manchester Metrolink between Altrincham and Manchester Piccadilly/Victoria on Sundays.
The following is reported from the National Rail website as at 5th July 2012.
Northern Rail
The following changes will apply:
- Trains between Manchester Piccadilly and Buxton will be replaced by buses between Manchester Piccadilly and Hazel Grove
- Trains between Southport and Stockport / Chester will run between Southport and Manchester Piccadilly and between Altrincham and Chester
- Replacement buses will run between Manchester Piccadilly and Stockport and between Stockport and Altrincham
- Passengers are advised that faster journeys are available between Manchester Piccadilly and Altrincham using the Metrolink tram service